Contact us

Are you interested in public EV charging stations with billing management or in a system solution for sustainable energy self-sufficiency for your building? Then please contact us  

Fields marked with * are required.

Call us

Address

Franz-Mayer-Straße 1,    93053 Regensburg, Germany

Frequently Asked Questions

The installation timeline depends on site conditions, grid capacity, and the type of charger being deployed. In most cases, a standard AC charging point can be installed and commissioned within a few days. DC fast charging installations typically take longer, ranging from several weeks to a few months due to additional grid connection requirements, permitting, and civil works.

Key factors include available grid capacity, required upgrades to electrical infrastructure, permitting processes, and on-site construction work. Early site assessment and coordination with the local grid operator can significantly reduce lead times.

Charging stations are designed to automatically shut down during grid outages for safety reasons. However, stations integrated with on-site storage or backup systems may continue limited operation depending on configuration.

Charging infrastructure is generally low-maintenance. Routine inspections, software updates, and occasional hardware checks are typically sufficient to ensure reliable operation and uptime. Remote monitoring further reduces the need for on-site interventions.

Yes. We provide a comprehensive site evaluation and consultation to assess technical feasibility, grid capacity, and optimal charger placement. This ensures efficient deployment and maximizes long-term operational performance.